PVC Crust Foam Board Creating CZPT Extruder
Specs
1, Building WPC Board CZPT
two, Thickness: three-30mm
three, Width: 1220mm
4, CE, ISO9001
Major CZPT Parameter
1, Conical double screw extruder SJSZ-80/156
A) Output: 300-400kg/h
B) Transmission method:
Higher torque output vertical reducer equipment box
Framework: Vertical
Offered with outside the house-circulation cooling method
CZPTed thrust bearing and substantial-torque output
Content of Gear: 20CrMnTi, with gear grinding specialized therapy and cementite
2. Mould
A) Composition: Particular style for PVC WPC board
B) Width of die: 1400mm
C)Thickness: 12-20mm
D) Material: 5CrNiMo, higher top quality alloy
3, Vacuum calibrating and forming table
Max. Calibrating width: 1450mm
Calibrating table duration: 2000mm
Vacuum pump electrical power: five.5kw*two units
Max. Exhausting volume: 80m3/min
Water pump electrical power: 4kw
4, CZPT bracket
A) Whole size of roller bracket 5000mm
B) CZPT Roller
Diameter: Ø 63mm
Size: 1320mm
5, Haul-off unit
Max. Pulling width: 1450mm
Max pulling thickness: 20mm
Pair roller qty: seven pairs
CZPTn motor electricity: five.5kw
six, Transverse cutting bracket
Rack kind synchronize pressing unit
Special style flat chopping motor: two.2kW
With non-pole cylinder remaining and right shifting system
Elements | Sum |
1,Conical double screw extruder SJSZ-eighty/156 | one set |
two,Extruder CZPT | one set |
3,Vacuum calibrating and forming desk | 1 set |
4,ZS-1450 CZPT bracket | 1 set |
five,Haul-off unit | 1 set |
six, Transverse slicing bracket | one established |
seven, Dropper for the completed product | one set |
8, Handle technique | 1 established |
TRADE Terms
- Payment CZPT: thirty% for prepayment by T/T, 70% for well balanced payment by T/T, or L/C can be suitable
- Supply Time: forty times soon after receipt of prepayment.
- Packing Method: Packing movie or wooden case
- Certain Time: 12 months
MACHINERUNNING Check AND After Service
- When equipment concluded, we will invited consumer come to our manufacturing unit to check the device and do the equipment take a look at. If machine is alright, then consumer spend for the stability. And examine machine load the container.
- When machine arrives client’s factory, if shopper wants, we will send 1-2 engineer to client’s manufacturing facility do the equipment installation and managing test, and also practice the nearby employee how to operate and maintain the device. It is chargeable.
- If have any question or problem on device procedure or maintain, welcome to get in touch with to us by email or calling. We stand by 24 hours.